Floorplan for Timing Closure
Use tapa floorplan to improve clock frequency on a supported multi-SLR FPGA.
It places tasks, balances their resource use, and adds pipelining where signals
cross SLR boundaries.
Floorplanning is optional. It is most useful when implementation reports show cross-SLR timing failures or routing congestion. It does not fix incorrect functionality or a long combinational path inside one task, and it is not needed when the design already meets timing.
Prerequisites
- A functionally correct design; run software simulation first.
- A work directory produced by
tapa analyzeandtapa synth. - The
cbcsolver onPATHfor planning. See Install CBC. - A supported device and platform.
- For a kernel with direct M-AXI ports: synthesis with the exact supported
--platform, plus a connectivity file assigning every port to a memory bank. - For
--run-implor--dse: thexilinx-vitisorxilinx-slashtarget, and the matching toolchain — Vitis/Vivado with a platform the installedv++accepts, or SLASH'sslashkitwith the V80 static shell forslash_v80_service(see Alveo V80 with SLASH).
For tighter designs, consider tapa synth --enable-synth-util before
floorplanning. It provides more accurate per-task resource estimates at the
cost of an additional Vivado synthesis run per task.
Basic workflow
tapa compile does not run the floorplan step. Run the stages separately so
you can insert it between synthesis and packaging:
tapa --work-dir work.out analyze \
--top VecAdd \
-f vadd.cpp
tapa --work-dir work.out synth \
--platform xilinx_u55c_gen3x16_xdma_3_202210_1 \
--clock-period 3.33
tapa --work-dir work.out floorplan \
--connectivity connectivity.ini
tapa --work-dir work.out pack \
-o vecadd.xo
If you already ran tapa compile in this work directory, analysis and
synthesis are complete: run only floorplan followed by pack. If you change
sources or rerun synth, run floorplan again before pack.
Assign memory banks
For this example, connectivity.ini assigns VecAdd's three direct M-AXI
parameters to separate HBM banks. On the V80 the same role is played by
slashkit's own configuration (nk=/sp=), described in
Alveo V80 with SLASH:
[connectivity]
sp=VecAdd.a:HBM[0]
sp=VecAdd.b:HBM[1]
sp=VecAdd.c:HBM[2]
Use <top-task>.<parameter> with the names from your C++ signature. For a
tapa::mmaps<T, N> parameter, use indices such as Bandwidth.chan[0].
Provide one assignment for every direct M-AXI port. A design without direct
M-AXI ports does not need this file.
Start with the defaults
The default options are a good first plan:
--partition-strategy autoselects the placement strategy.--pp-scheme doublecontrols pipelining across SLR crossings.--usage-limit 0.7is the initial per-slot resource target; the planner may raise it when the target is infeasible.--max-seconds 600limits each planning solve, not the total runtime of the whole floorplan step.
If pipelining consumes too many resources, try --pp-scheme single. If a
planning solve needs more time, increase --max-seconds. See the
tapa floorplan CLI reference for all
options.
Package and validate
floorplan writes floorplan.xdc. For xilinx-vitis, pack applies that
file and the staged connectivity configuration automatically, so no extra
flags are required. For xilinx-slash, link inserts Full register slices on
each HBM interface selected by the connectivity map, then registers a generated
pre-place script with Vivado. It anchors the HBM bridges, slices and reset
synchronizer to SLR2, checks optimized URAM demand against the RM inventory,
sources the staged floorplan, and requests clock-region replication for
eligible high-fanout fabric controls. Registering the script in utils_1
ensures that the separate impl_1 process executes it.
Pipelining can add latency across SLR boundaries but should not change the results. Run fast cosimulation again to check functionality. Fast cosim does not measure achieved Fmax; use the implementation timing report or on-board measurements for that.
Measure a plan with --run-impl
Planning alone does not prove that the design closes timing. To package one
plan and run the device's implementation backend (v++ --link on U-series,
SLASH on V80) for feedback:
tapa --work-dir work.out floorplan \
--connectivity connectivity.ini \
--run-impl \
--vivado-threads 2
Review:
work.out/floorplan-metrics.jsonfor the selected plan's utilization and achieved frequency.work.out/floorplan-timing.rptfor the post-implementation timing details.work.out/floorplan.xclbin(Vitis) orwork.out/floorplan.vbin(SLASH), the implemented bitstream of the measured plan.
For Vitis, candidate exploration stops after post-route timing. After selecting
the winner, TAPA runs one additional full v++ --link with that candidate's
prepared package and constraints to produce floorplan.xclbin. The top-level
metrics and timing report come from this final link; dse/candidates.json
retains the exploration measurements used for ranking. SLASH already completes
its hardware implementation during exploration and needs no additional link.
If implementation fails inside one task's combinational logic, change the HLS source rather than increasing floorplan effort. Add pipelining or split the operation across cycles, then rerun synthesis and floorplanning.
Explore plans with --dse
Design-space exploration sweeps utilization targets and keeps the candidate
with the highest measured frequency. The ranking backend is the device's own:
v++ --link on U-series boards, SLASH on the V80:
tapa --work-dir work.out floorplan \
--connectivity connectivity.ini \
--dse \
--dse-min 0.55 \
--dse-max 0.90 \
--dse-step 0.05 \
--dse-jobs 2 \
--vivado-threads 2
The sweep starts at --dse-max and moves toward --dse-min.
--dse-jobs limits concurrent package/link jobs; --vivado-threads controls
Vivado synthesis parallelism within each job. Increasing either can
substantially increase memory use. Review dse/candidates.json for the full
sweep and floorplan-metrics.json for the winner.
Remote execution
Planning itself runs locally and needs local cbc. With --remote-host,
--run-impl and --dse can run their Vitis/Vivado implementation jobs on the
remote machine. See Remote Execution.
Common problems
| Problem | What to check |
|---|---|
no floorplan device table matches ... | Use a supported device family and, for direct M-AXI, its exact platform. |
| External memory requires a platform | Rerun synth with the exact supported --platform, then rerun floorplan. |
| Connectivity is missing or incomplete | Add one sp= assignment per direct M-AXI port and check top-task and parameter spelling. |
| Planning is infeasible | Review per-task area, try --pp-scheme single, and consider --enable-synth-util for better estimates. |
| Planning times out | Increase --max-seconds; it applies per solve rather than to the whole step. |
| Timing still fails within a task | Restructure that task in HLS. Floorplanning addresses placement and routing, not logic depth. |
| Results differ after floorplanning | Rerun fast cosim. Then check custom RTL and protocol correctness; floorplanning should add latency, not change values. |